You are in:Home/Publications/"The Mitigation Measures of Sediment Deposition in-front of El Kuraimat Power Plant Intake". Journal of Scientific and Engineering Research (JSAER), India, June 2016

Prof. Gamal Helmy Mohamed Elsaeed :: Publications:

Title:
"The Mitigation Measures of Sediment Deposition in-front of El Kuraimat Power Plant Intake". Journal of Scientific and Engineering Research (JSAER), India, June 2016
Authors: Gamal Elsaeed, Mohammad Bahgat, Mohammad Ibrahim and Rowida Elsayed
Year: 2016
Keywords: Not Available
Journal: The objectives of the current research were to mitigate the sedimentation problem in front of thermal power plant intakes, case study, El Kuraimat thermal power plant, also investigate the effectiveness of a set of alternatives to solve this problem. Several sorts of data were collected including, velocity measurements, hydrographic survey data, water levels and discharges in several years and seasons. 2-D numerical model, iRIC "international River Interface Corporative" was utilized to simulate the study area and test the set of alternatives to meet the optimum solution, the model was calibrated and verified using the field velocities and water levels. The set of alternatives were used to improve the flow pattern inside the eastern channel, where the plant intake was located. The model results were revealed that connecting the small formed island and the downstream tip of El Kuraimat island to bed level 23.00 m, was the optimum solution from both the hydraulic and economical point of view.
Volume: 3
Issue: 3
Pages: 155-164
Publisher: Not Available
Local/International: International
Paper Link: Not Available
Full paper Gamal Helmy Mohamed Elsaeed_JSAER2016-03-03-155-164.pdf
Supplementary materials Not Available
Abstract:

The objectives of the current research were to mitigate the sedimentation problem in front of thermal power plant intakes, case study, El Kuraimat thermal power plant, also investigate the effectiveness of a set of alternatives to solve this problem. Several sorts of data were collected including, velocity measurements, hydrographic survey data, water levels and discharges in several years and seasons. 2-D numerical model, iRIC "international River Interface Corporative" was utilized to simulate the study area and test the set of alternatives to meet the optimum solution, the model was calibrated and verified using the field velocities and water levels. The set of alternatives were used to improve the flow pattern inside the eastern channel, where the plant intake was located. The model results were revealed that connecting the small formed island and the downstream tip of El Kuraimat island to bed level 23.00 m, was the optimum solution from both the hydraulic and economical point of view.