• Consultant of surveying for determination of obstacles drawings & information centers for the following airports: Cairo, Alexandria, Hurgada, Luxor, Aswan & Imbaba |
• Consultant of surveying for Survey & architecture mapping of Monumental areas in Alexandria (Kom ElShouafa, ElWardeyan, Roman Theatre, Mostafa Kamel, El Shatby & El Anfoushy). |
• Consultant of surveying for Surveying of settlement, inclination & displacement of 115 monumental marinets in Cairo. |
• Consultant of surveying for Surveying of settlement, inclination & displacement of walls of electricity station building of north Cairo. |
• Consultant of surveying for Restoring projects for Badr ElDin Elwaneay mosque, Gani Beik Naeb Geddahm Abedy Beik mosque & Shaikhoon mosque. |
• Consultant of surveying for Surveying & Architechtic mapping of Archeological Beit ElSeheimy. |
• Consultant of surveying for Production of contour maps of an area of 30,000 Feddens plus setting out highways all in 6 of October city. |
• Consultant of surveying for The centre & it’s members as consultants for survey works for Mubarak grand pumping station in Toushka, where it supervised & survey works of dredging of paths below the lakes waters, locating coordinates, producing ground controls, selecting pathways, performing all civil & concrete works with respect to the surveying section, all monitoring of constructions displacement & crystal movements, observations from satellites, installing the monitoring system of changing locations & ground distribution system, and Fixing of ground controls which serve the works in the station. |
• Consultant of surveying for Surveying work & mapping of the (As built) of gas pipelines for (Egypt gas Company) of the following:- |
• Steel pipeline of Tebeen (Iron & Steel factory) of diammeter 16 inches, & of approximate length of 3300 meters, Cairo. |
• Steel pipeline of (18 ElHarby factory) of diameter of 6 inches, & approximate length of 160 meters, Cairo. |
• Steel pipeline of Gaztech car station of Meet Halfa, of diameter 6 inches, & of app. Length of 2000 meters, ElKalyoubeya. |
• Steel pipeline of Gaztech car station of ElKatameya, of diameter 8 inches & of app. Length of 180 meters, Cairo. |
• Steel pipe line of mixing oils inventory Merghem of diameter 3 inches, & of app. Length of 1645 meters, Alexandria. |
• Steel pipeline (Entergean) of Sidikerir, of diameter 24 inches, & of app. Length of 1850m, Alexandria. |
• Consultant of surveying for Steel pipeline of Gaztech car station of Ezz ElDin, of diameter 5 inches & of app. Length of 326m, Ismailia. |
• Steel pipeline of the area of low pressure in Helwan, of diameter 22 inches, & of app. Length of 111000 meters, Cairo. |
• Pipeline of ElSadat City, Of diameter 16 inches, & of total length of 6500km. |
• Consultant of surveying for Surveying Works & mapping of the (As built) of the Gas lines of 24 inches on the east & west banks of the Sweis Canal, from the electricity station of Eyoon Mousa, till ElSalam station south of Port Saied & from east & west of station 107 in Sweis till south of Port Saied West of the Canal & the area of ElEin Elsokhna harbour using GPS instruments & by fixing with respect to 1st degree points of Egyptian triangulation network, & the production of digital maps of the highest level of accuracy. As well as the surveying mapping of the raw lines of diameters 22& 26 inches from Somid stations to Midor station & El Dekheila Harbour, of length 32 km, of midtap company lines property, the total length of all worked lines is equal to 300 km. |
• Consultant of surveying for Fixing, observing & calculating coordinates of surveying points using GPS techniques, & calculating the transformation parameters to the Egyptian surveying authority coordinates. And these points were observed in different places as Abu sultan & Upper Egypt. |
• Consultant of surveying for Survey works for lifting up water pipelines to Neema Hotel & Resort in Sharm El Sheikh, & producing the maps needed & a study on the network state on pipe types, diameters & differences of levels basis, & determining depths & setting them out on the surveying maps of the resort. |
• Consultant of surveying for Survey works & mapping of (As built) of a 16-inch diameter industrial sewerage, of length 6 km, in Midor region, Alexandria. |
• Consultant of surveying for Setting out, observing & calculating Gas line of El Burolos project of length 27 km & that was by setting out points every 50 meters along the line. Also, fixing Surveying Control points, of a total of 52 fixed points along the line. |
• Consultant of surveying for Survey works & mapping of the (As built) of a Gas pipe line from El Swez to the Bloof room in el Sokhna harbour, of a length 50 km. |
• Consultant of surveying for fixing 103-survey control points along the El Sadat gas pipeline, Abu Homus. |
• Consultant of surveying for Survey works & mapping, setting out & determining the pathway of propane line of (Domaits – Port Said) of length 50 km. |