You are in:Home/Publications/Cost Analysis of a Two-Unit Cold Standby System Considering Hardware, Software Failures and Inspection with Maximum Repair Time

Dr. Abd El Ghany Bediar Abd El Ghany Ahmed :: Publications:

Title:
Cost Analysis of a Two-Unit Cold Standby System Considering Hardware, Software Failures and Inspection with Maximum Repair Time
Authors: M.A.W. Mahmoud; M.Y. Haggag; A.E.B. Abd Elghany
Year: 2015
Keywords: Cold Standby System, Maximum Repair Time, Inspection, Replacement, Profit Gain
Journal: International Journal of Computer Applications
Volume: 129
Issue: 5
Pages: 1-8
Publisher: Foundation of Computer Science (FCS), NY, USA
Local/International: International
Paper Link:
Full paper Abd El Ghany Bediar Abd El Ghany Ahmed _Cost Analysis of a Two-Unit Cold Standby System.pdf
Supplementary materials Not Available
Abstract:

The present paper deals with a reliability model of a two unit cold standby system that exposed to two types of failures. In each unit there are hardware and software componentes work together and fail independently. there is a single server who visits the system immediately when required. The server inspects the unit in case of software failure and decides either to repair or replace it. The h/w components undergo for repair at their failure and are replaced by new one in case of arriving to maximum repair time. All time distributions are considered to be exponential. Various measures of reliability of the system are obtained using regenerative point technique. Finally simulation study is done to illustrate the results.