Benha University
Staff Search:
Go
Login
You are in:
Home
/
Attended Workshops
Dr.
Fikry
Gomaa
Aly
Metwally
::
Workshops
/
Conferences:
Workshop / Conference
Year
Metwally, F., (2006), (Resource Allocation and Leveling_Based Scheduling of Construction Projects Using Genetic Algorithm.), Proceedings of the Fifth International Engineering Conference (March 27-31, 2006),EL-Mansoura-Sharm EL-Sheikh.
2006
Elazouni, A., El-Kasaby, S., and Metwally, F., A Decision Support System for Maximizing Contractor Actual Profitability,” Proceedings of the 6th International Conference for Building and Construction (Inter Build 99), Cairo, (1999), pp. 393–405.
1999