You are in:Home/Publications/OPTIMUM VALUE OF QUALITY COST IN WATER STRUCTURES PROJECTS BY USING CONFORMANCE-NONCONFORMANCE (CNC) MODEL | |
Dr. Mohammed Abdelhamid Abdelatif :: Publications: |
Title: | OPTIMUM VALUE OF QUALITY COST IN
WATER STRUCTURES PROJECTS BY USING
CONFORMANCE-NONCONFORMANCE (CNC)
MODEL |
Authors: | Mohamed Abdel-Hamid Mohamed, Hanaa Mohamed Abdelhaleem |
Year: | 2019 |
Keywords: | cost of quality, conformance cost, nonconformance cost, water structures projects |
Journal: | Not Available |
Volume: | Not Available |
Issue: | Not Available |
Pages: | Not Available |
Publisher: | Not Available |
Local/International: | International |
Paper Link: | Not Available |
Full paper | Mohammed Abdelhamid Abdelatif_2- Optimum Value of Quality Cost in water structures projects by using Conformance-Nonconformance (CNC) model..pdf |
Supplementary materials | Not Available |
Abstract: |
In Egypt, which has one of the fastest developing construction markets in Middle East, it is very important to estimate the cost of quality of these projects. The objective of this paper is to estimate the cost of quality and determine its optimum values in the Egyptian construction projects by applying the conformance-nonconformance (CNC) model to water structures projects. The research showed that the actual cost of quality (COQ) value represents 1.54% of the entire project cost and that the optimal quality cost value was calculated to be 1.99% of the entire quality cost. On the other hand, conformance cost of quality was found to be 1.10% and nonconformance cost of quality was found to be 0.44% of the total project cost. |