INTEGRATING THE PRINCIPLES OF SUSTAINABILITY AND PROJECT MANAGEMENT AT THE EARLY STAGES OF CONSTRUCTION PROJECTS
Authors: Manal Abd El Hamid, Sahar Sh. Hasan, Ibrahim Abd El- Rashied, Samia Ali
Year: 2015
Keywords: Sustainable construction; Feasibility stage; Project management; Framework of Sustainable construction; Green rating systems.
Journal: journal of Al Azhar university engineering sector
Volume: 10
Issue: 36
Pages: 945-954
Publisher: Al Azhar university engineering sector
Local/International: International
Paper Link: Not Available
Full paper Samia Ali_INTEGRATING THE PRINCIPLES..pdf
Supplementary materials Not Available
Abstract:

Sustainable construction (SC) is considerably new trend particularly in developing countries such as Egypt. So, applying project management (PM) to that new trend of construction requires the relevant stakeholders to consider the sustainability principles in implementing PM at the early phases of the project. This promotes for significant cost savings over time, and a unique marketing strategy. For construction projects, Feasibility stage (FS) is the first and most important stage before undertaking project design & construction and its effectiveness will affect directly the success of the project. A vast literature review revealed a number of essential elements that should be considered and a number of challenges that should be mitigated to integrate the principles of sustainability and PM in construction projects. Also, to investigate the current status for managing FS of SC projects in Egypt; such as the main benefits and barriers during managing FS of SC projects; the survey research method has been adopted and data were collected using designed structure questionnaire. This paper introduces a flowchart for applying PM Principles at the FS for SC projects. This flowchart outlines the necessary elements that enable project stakeholders to consider sustainability principles while making decisions in FS , also it justifies additional preplanning effort of sustainable construction projects. Additionally, the proposed flowchart provides a good base for projects that seek green accreditation to comply with Egyptian Green Pyramid Rating System (GPRS), and provides channels for overcoming the challenges of achieving SC project starting by FS. Consequently, the proposed flowchart works as a kick of for managing SC projects in its coming phases. Moreover, this paper provides several recommendations on how to enable project stakeholders overcoming the barriers of starting FS for SC projects