You are in:Home/Publications/THE FEASIBILITY OF LONGER SPANS IN CABLE STAYED BRIDGES BRIDGES

Prof. Ashraf mohamed mohamed abourayan :: Publications:

Title:
THE FEASIBILITY OF LONGER SPANS IN CABLE STAYED BRIDGES BRIDGES
Authors: THE TEASItsILITY OF
Year: 2001
Keywords: Cable Stayed Bridges
Journal: Mansourah Engineering Journal
Volume: 26
Issue: 2
Pages: c51-c61
Publisher: Mansourah University
Local/International: Local
Paper Link: Not Available
Full paper Ashraf mohamed mohamed abor rian_The Feasibilty of Longer Spans in Cable-Stayed Bridges.pdf
Supplementary materials Not Available
Abstract:

Increasing the maximum span length for cable-stayed bridges has been always a challenging target. To overcome resections on maximum span length associated with the classical systems, a modified statical system should be considered. In this paper, a comparative analysis for a modified statical system is presented. The classical vertical pylons are replaced by pairs of inclined pylon legs (V-shaped) spreading out longitudinally and connected at the top by horizontal ties. Two different V-shaped systems are investigated. The effects of different cables configurations and numbers are considered. The results .ale compared with a classical fan-type cable- stayed bridge system, The numerical results indicate the feasibility of longer spans, since the modified statical system gives much less responses than the classical system.

Google ScholarAcdemia.eduResearch GateLinkedinFacebookTwitterGoogle PlusYoutubeWordpressInstagramMendeleyZoteroEvernoteORCIDScopus