Experience |
Design of metal sheets painting shop for Cairo metal work 1979 estimated cost 3 million LE. |
Design of deep freezers and refrigerators factory at Abo Rawash Giza, Egypt, 1980 estimated cost 7 million LE |
13) Design of the following pumping station:
a- 11.5 m3/sec b-4 m3/sec c- 1.5 m3/sec
For El Gezera irrigation project –Iraq, during the period 1984-1988
|
Mechanical measurements course through the Arab training bureau 2008 |
Oil storage tanks design and inspections through the Arab training bureau 2008 |
Pumps maintenance and operation through the Arab training bureau 2006 |
Redesign water pipe line for a pumping station 10 km for the mechanical& electrical authority Ministry of irrigation.2008 |
Course and networking in the field of computers 1993- till now |
Design a group of multistage centrifugal pumps Using computer modeling CFD for Turkish firm. |
Air-conditioning system design and software analysis |
Chillers systems control training course.. Dubai |
Industrial safety training course Saudi Arabia |
Diesel engines maintenance training course Saudi Arabia. |
New technologies in the field of Water desalination , training course, Egypt |
Quality assurance for the erection of Inshas nuclear reactor. |